+44 (0)20 3301 0546 hello@stemkogroup.com

101 Bayham Street

Factory-Finished Timber Doorsets for Contemporary Commercial Interiors

Location: London
Sector: Commercial Office
Main Contractor: QOB Interiors

Project Overview

101 Bayham Street required a coordinated timber doorset package as part of a commercial office development focused on contemporary finish quality and programme efficiency.

Stemko delivered factory-painted timber doorsets designed to enhance finish consistency while streamlining installation.

Scope of Works

  • 63 factory-painted timber doors

Delivered via our certified Timber Doorsets.

The Challenge

Achieving High-Quality Finish with Programme Certainty

The project required:

  • Consistent painted finish across all openings
  • Reduced on-site finishing works
  • Efficient installation sequencing
  • Full fire-rated compliance

On commercial interior projects, uncontrolled finishing can create programme delays and quality inconsistencies.

As explored in 5 Common Fire Door Failures (and How to Avoid Them, installation accuracy and component compatibility are critical to long-term performance.

The Stemko Solution

Factory-Controlled Finishing

By supplying factory-painted doorsets, Stemko ensured:

  • Uniform finish quality
  • Reduced site labour and rework
  • Accelerated installation
  • Compliance integrity maintained

This approach reflects Stemko’s commitment to delivering controlled, traceable systems rather than site-assembled components.

Delivery & Installation

Installation was carried out in coordination with QOB Interiors, ensuring programme alignment and minimal disruption. Quality inspections and structured sequencing ensured fire performance requirements were maintained across all openings.

The Outcome

The project benefited from improved programme efficiency, consistent finish quality and certified compliance — delivering a clean, refined commercial interior environment.

Why Stemko?

The delivery at 101 Bayham Street reflects Stemko’s strength in combining aesthetic precision with certified performance. Through factory-controlled preparation and coordinated installation, we enhanced programme certainty while maintaining strict compliance — reinforcing our position as a trusted commercial interiors partner.

3 + 9 =