+44 (0)20 3301 0546 hello@stemkogroup.com

265 Strand

High-Specification Doorset Delivery for a Central London Education Environment

  • Location: London
  • Sector: Education
  • Main Contractor: Collins Construction

Project Overview

265 Strand is a high-profile education development in central London, requiring a high-performance internal and external doorset package that balanced aesthetic quality with strict fire and security compliance.

Appointed by Collins Construction, Stemko delivered a comprehensive supply and installation package across the scheme — supporting internal circulation, teaching areas and secure external access points.

Scope of Works

  • 209 high-end timber doorsets
  • 14 external steel doorsets

Supplied through:

In total, 185 timber doorsets and 44 four-sided concealed steel riser doors were installed. The timber doors incorporated bespoke details, and architrave, with PVD coated ironmongery resulting in a stunning finish.

The Challenge

Delivering Durability, Safety and Finish Quality in Education

Education environments require:

  • Long-term durability
  • Fire compartmentation compliance
  • Controlled access and external security
  • High aesthetic finish quality

In addition, central London logistics required careful coordination of deliveries and installation sequencing.

As discussed in Future-Proofing Campuses: Fire Door Standards for Expanding Universities education projects demand scalable compliance and robust specification from the outset.

The Stemko Solution

High-End Internal Timber Doorsets

Stemko supplied 209 timber doorsets configured to meet required fire ratings and aesthetic standards.

Specification review ensured:

  • Correct fire-rated configurations
  • Compatible, compliant ironmongery
  • Installation aligned with test evidence

Further insight into compliant component integration can be found in:
Architect’s Guide to Fire Door Ironmongery

External Steel Security Doorsets

The 14 external steel doorsets provided:

  • Enhanced durability
  • Security performance
  • Required fire-rated compliance

Installation sequencing ensured perimeter integrity was maintained throughout the works.

Delivery & Installation

Stemko operated under approved RAMS and worked in close coordination with Collins Construction to maintain programme certainty.

The single-source model ensured:

  • Clear accountability
  • Reduced subcontractor interface complexity
  • Consistent installation standards
  • Full compliance documentation

The Outcome

The completed scheme delivered a robust, compliant and aesthetically refined doorset solution suitable for a modern education environment.

The project highlights Stemko’s strength in:

  • High-spec education environments
  • Combined timber and steel doorset packages
  • Central London project coordination
  • Compliance-led installation

Why Stemko?

The 265 Strand development highlights Stemko’s expertise in delivering high-performance doorset solutions within education environments, where durability, safety and finish quality must align seamlessly. Through certified supply and controlled installation, Stemko ensured long-term compliance while supporting programme certainty in a complex urban setting.